External cargo sling, LOGGING conversion Level 2 to 3
Preconditions:FLYING WITH VERTICAL REFERENCE POINT
Students must be able to carry out a stable hovering manoeuvre by means of vertical reference points without external cargo before beginning the training with external cargo.
Duration:4 training days with FI (ECS) divided into:
1 training day with one marshaller
2 training days with two marshallers
Inhalt:10 flight hours divided into:
100 cycles
10 missions
The extent of the practical training depends on legal regulations and individual trainee performance.
DEFINITIONS
Cycle:
A cycle is a flight from A to B with external cargo sling and subsequent return to A.
Mission:
A mission is an ECS flight or a number of ECS flights operated from A to B.