ECS 3

External cargo sling, LOGGING

Preconditions:
  • CPL(H) / ATPL(H)
  • Completed ECS level 1 (20 m)
  • 1000 ECS cycles
  • 10 h PIC on training helicopter
  • Completed ECS 3 basic course
  • Completed study of the Marshaller Syllabus (SUVA brochure)
  • Practical marshaller training for logging

FLYING WITH VERTICAL REFERENCE POINT
Students must able to carry out a stable hovering manoeuvre by means of vertical reference points without external cargo sling before beginning the training with external cargo sling.

Duration:5 training days with FI (ECS) divided into:
2 training days with one marshaller
3 training days with two marshallers

Inhalt:15 flight hours divided into:
150 cycles
25 missions

The extent of the practical training depends on legal regulations and individual trainee performance.

DEFINITIONS
Cycle:
A cycle is a flight from A to B with external cargo sling and subsequent return to A.

Mission:
A mission is an ECS flight or a number of ECS flights operated from A to B.

 

 

 

 

 

 


 

 

 

 

 

Logo A und H

Lupe
 
ECS3 Bild3
Bild1Bild2
Bild4Bild5 Bild6
Bild7Bild10 Bild8