External cargo sling, CONSTRUCTION
Preconditions:FLYING WITH VERTICAL REFERENCE POINT
Students must be able to carry out a stable hovering manoeuvre by means of vertical reference points without external cargo sling before beginning the training with external cargo sling.
Duration:4 training days with FI (ECS) divided into:
1 training day with two marshallers (mounting work)
3 training days with three marshallers (mounting work)
Inhalt:8 flight hours divided into:
50 cycles
5 missions
The extent of the practical training depends on legal regulations and individual trainee performance.
DEFINITIONS
Cycle:
A cycle is a flight from A to B with external cargo sling and subsequent return to A.
Mission:
A mission is an ECS flight or a number of ECS flights operated from A to B.